Basic Info.
Model NO.
GCK
Transport Package
Wooden Case
Specification
800*1200*2200
Trademark
HFY
Origin
China
HS Code
8537109090
Production Capacity
2000
Product Description
GCK draw out type Low Voltage Switchgear
Product features
GCK series Low voltage switchgear(hereinafter short as switchgear)is a complete power distribution device for 3.6~24kV,3-phase AC 50Hz,single-bus and single-bus sectionalized system. It is mainly used for power transmission of middle/small generators in power plants; power receiving, transmission for substations in power distribution and power system of factories, mines and enterprises, and starting of large high-voltage motor, etc.,so as to control, protect and monitor the system. The switchgear meets IEC298,GB3906-91.In addition to be used with domestic VS1 vacuum circuit breaker, it can also be used with3AH5 from Siemens domestic ZN65A,and
VB2 from GE, etc.,it is truly a power distribution device with good performance. In order to meet the requirement for wall mounting and front-end maintenance, the switchgear is equipped with a special current transformer, so that the operator can maintain and inspect it in front of the switchgear.
Rated insulation voltage 600-1000v
Rated working voltage 380-660v
Level busbar current rating ≤3150A
Nominal current of vertical bus 1200A
Rated short-time peak current 105KA
Protection grade IP30
Operating environment:
1)Ambient temperature:-10°C-+40°C;
2)Altitude: high voltage ≤1000Meter, low voltage ≤2500Meter (technical department will design
specially if exceeds);
3)Relative humidity:≤85%
4)Seismic intensity:≤ magnitude 8;
5Apply to the places have no fire,no explosion danger, no serious pollution,no chemical corrosion
and no violent vibration.
Advantages
1. Panel board with compact structure, save the volume of cabinet body.
2. The panel board can be arranged back to back
3. The panel board body can meet the requirements of earthquake resistance, oscillation resistance and shock resistance
4. It can be built up into different modes freely, such as fixed type and draw-out type
5. Corresponding protection class of the panel board body could be designed according to the different requirements of the job and environment.
6. Select and using standard component entirely, convenient for the design of project planner.
7. The arrangement of power distribution circuit is economic
8. With anti electric arc design
9. Convenient for equipment upgrade and inprovement
10. The panel board is free of maintenance to the most extent.
11. Safe for the opeartion
12. Reliable enough and high flexibility.
Switchgear Structure
Conditions of use
1. Elevation: the elevation shall not exceed 2000MM;
2. Ambient temperature: -25°C~40C;
3. Relative humidity: daily average is no more than 95%, and monthly average is no more than 90%;
4. Surrounding environment: the surrounding air is not polluted by corrosive gases or flammable gases, water vapor, etc.No frequent violent vibration.
5. If the above normal conditions of use are exceeded, the user may negotiate with the company.
ATTENTION:
1.The payment term: We accept TT,30% deposit and 70% balance against copy of BL.
2.The delivery time: Usually it will take about 15-20 days.
3.The standard of package: Usually use strong plywood case for protection.
4.The logo: If you have good quantity, it absolute no problem to do OEM.
5.Our market: our products are popular in Indonesia, Philippines, Russia, USA, Middle East and so on. Some of them are our regular customers and some of them are developing. We hope you can join us and make mutual benefit from our cooperation..
6.Warranty: in 12 month since BL date.
Technical data
Our Workshop
Company introduction
Qingdao Hengfengyou Electrical Engineering Co., Ltd. (hereinafter referred to as Hengfengyou) is a large-scale enterprise group with electricity transmission and distribution as its main business,which integrates scientific research, development, manufacturing and trade. After 30 years rapid economy development in China, Hengfengyou now is a leading R & D, manufacturing and service base for MV
, HV and ultra-HV power distribution equipment in China. At present,we have 50 senior technicians and more than 300 employees, with a complete sales and service system. Our products sell well at home and abroad, and our annual output value adds up to $100 million. .
At present, Hengfengyou has 6 wholly-owned and holding subsidiaries, which are respectively engaged in R & D, manufacturing and service of transformers, switchgear, package/unit substation, pole-mounted high-voltage vacuum circuit breakers, new energy, and electrical engineering.
For a long time, the company has maintained close technical exchanges and cooperation with domestic and foreign universities, scientific research institutes and electric power enterprises.
Hengfengyou independently designed and developed SCB series dry-type transformer and SC series oil immersed transformer. Our product performs with high operation efficiency, and obvious energy conservation. The overall performance index reaches the world's advanced level.
The company also maintains long-term strategic partnership with Schneider, ABB, Simens, Chint and other electric suppliers. We absorbed foreign advanced experience in electrical equipment production and independently designed and developed a series of substation equipment, which realized the automation and intelligence of the substation, and of which the performance has been highly recognized by the user at home and abroad. In the following five years, the company plans to build an intelligent workshop with an annual output of 100000 transformers.Then,the intelligent robot will replace 80% of the existing labor force, which will greatly improve the production efficiency, lower production cost, and produce more energy-saving, environmentally friendly, more safe and reliable the product for the users!
Under China's one belt, one road policy and as an outstanding one of China manufacturing enterprises of power transmission and distribution equipment, Hengfengyou has provided reliable electrical products and services for more than 50 countries and regions in the world. A good reputation of the brand name "HFY" was established in the global market, and won wide recognition and trust from customers.
In the new era, the company will adhere to the service concept of "global intelligent electric service provider, make life better", and adhere to the enterprise tenet of "integrity, innovation, customer achievement". We take "high quality products, wholehearted service" as the team spirit, and provide more excellent products and services for customers at home and abroad. Hengfengyou sincerely hope to establish with clients at home and abroad long-term win-win cooperation facing the future!
HFY Certificate
The Finished Power Project
Our Services
1.Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testing.
d. quick response within 12 hours any time.
3. After sale service
a.All parts are under Two Years Warranty with defects from manufacturer. All spare parts and component can be offered for free from the original manufacturer or HFY.
b. Training
We will provide free training to your technician free of charge at our factory site in Shanghai, China. The total training period would be 2 working days. All travel and related expensed would be at the purchaser's expense.
c. Technical Documents:
Original operation and service manuals, the service manual is completed with wiring diagram, block diagram and trouble shooting information.
d. Installation
Usually, clients can do the installation and operation by themselves when following the detailed English user manual. If clients want our technician do this work, please read the following terms:
The initial installation is not included with the professional HFY team member. All installation with the Hengfengyou team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While Hengfengyou team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for the Hengfengyou team required, the surcharge will be made in advance by the purchase at US$100/person/day plus all travel expenses. Travel expenses; local and destination transportation charges (air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily meals
Our Team and Exhibition
FAQ
Q1: Is OEM/ODM available?
A1: Yes, it is! Our products can be Customized. We have design and engineer teams,we can customize products according to customers' drawing or requirements.
Q2: What's your MOQ?
A2: One Set.
Q3: How is the delivery time?
A3: It depends your order quantity and it normally takes about 15-20 days.
Q4: How do you control the quality?
A4: We have QC team comply with TQM to ensure the quality. Each step is in compliance to the standards. At the same time, we will take photos and shoot video for you if you need.Every product will be fully assembled and carefully tested before packing and shipping.
Q5: How long is the warranty?
A5: Within one year from the sale date, if there are any accessory problems, you just provide the photos of damaged accessory, then we will provide free accessory. According to the number of products, we will provide easily damaged accessories for free. We also can provide technical support if you need.
Product features
GCK series Low voltage switchgear(hereinafter short as switchgear)is a complete power distribution device for 3.6~24kV,3-phase AC 50Hz,single-bus and single-bus sectionalized system. It is mainly used for power transmission of middle/small generators in power plants; power receiving, transmission for substations in power distribution and power system of factories, mines and enterprises, and starting of large high-voltage motor, etc.,so as to control, protect and monitor the system. The switchgear meets IEC298,GB3906-91.In addition to be used with domestic VS1 vacuum circuit breaker, it can also be used with3AH5 from Siemens domestic ZN65A,and
VB2 from GE, etc.,it is truly a power distribution device with good performance. In order to meet the requirement for wall mounting and front-end maintenance, the switchgear is equipped with a special current transformer, so that the operator can maintain and inspect it in front of the switchgear.
Rated insulation voltage 600-1000v
Rated working voltage 380-660v
Level busbar current rating ≤3150A
Nominal current of vertical bus 1200A
Rated short-time peak current 105KA
Protection grade IP30
Operating environment:
1)Ambient temperature:-10°C-+40°C;
2)Altitude: high voltage ≤1000Meter, low voltage ≤2500Meter (technical department will design
specially if exceeds);
3)Relative humidity:≤85%
4)Seismic intensity:≤ magnitude 8;
5Apply to the places have no fire,no explosion danger, no serious pollution,no chemical corrosion
and no violent vibration.
Advantages
1. Panel board with compact structure, save the volume of cabinet body.
2. The panel board can be arranged back to back
3. The panel board body can meet the requirements of earthquake resistance, oscillation resistance and shock resistance
4. It can be built up into different modes freely, such as fixed type and draw-out type
5. Corresponding protection class of the panel board body could be designed according to the different requirements of the job and environment.
6. Select and using standard component entirely, convenient for the design of project planner.
7. The arrangement of power distribution circuit is economic
8. With anti electric arc design
9. Convenient for equipment upgrade and inprovement
10. The panel board is free of maintenance to the most extent.
11. Safe for the opeartion
12. Reliable enough and high flexibility.
Switchgear Structure
Conditions of use
1. Elevation: the elevation shall not exceed 2000MM;
2. Ambient temperature: -25°C~40C;
3. Relative humidity: daily average is no more than 95%, and monthly average is no more than 90%;
4. Surrounding environment: the surrounding air is not polluted by corrosive gases or flammable gases, water vapor, etc.No frequent violent vibration.
5. If the above normal conditions of use are exceeded, the user may negotiate with the company.
ATTENTION:
1.The payment term: We accept TT,30% deposit and 70% balance against copy of BL.
2.The delivery time: Usually it will take about 15-20 days.
3.The standard of package: Usually use strong plywood case for protection.
4.The logo: If you have good quantity, it absolute no problem to do OEM.
5.Our market: our products are popular in Indonesia, Philippines, Russia, USA, Middle East and so on. Some of them are our regular customers and some of them are developing. We hope you can join us and make mutual benefit from our cooperation..
6.Warranty: in 12 month since BL date.
Technical data
Items | Parameters | |
Rated insulation voltage (V) | 660 | |
Rated operating voltage (V) | 380/660 | |
Auxiliary circuit rated voltage (V) | AC | 220/380 |
DC | 110/220 | |
Operating frequency (Hz) | 50 - 60 | |
Rated current (A) | Horizontal bus-bar | < 3150 |
Vertical bus-bar | 630/800 | |
Rated short-time withstand current | Midline (kA/1 s) | 50 |
Bus-bar (kA/1 s) | 30 | |
Rated peak current (kA/0.1 s) | 105/50 | |
Functional unit breaking capacity (kA) | 50 (effective value) | |
Cabinet protection degree | IP40 | |
Bus-bar | Three phase four wire system, three phase five wire system | |
Operating mode | On-site, distance and automatic |
Our Workshop
Company introduction
Qingdao Hengfengyou Electrical Engineering Co., Ltd. (hereinafter referred to as Hengfengyou) is a large-scale enterprise group with electricity transmission and distribution as its main business,which integrates scientific research, development, manufacturing and trade. After 30 years rapid economy development in China, Hengfengyou now is a leading R & D, manufacturing and service base for MV
, HV and ultra-HV power distribution equipment in China. At present,we have 50 senior technicians and more than 300 employees, with a complete sales and service system. Our products sell well at home and abroad, and our annual output value adds up to $100 million. .
At present, Hengfengyou has 6 wholly-owned and holding subsidiaries, which are respectively engaged in R & D, manufacturing and service of transformers, switchgear, package/unit substation, pole-mounted high-voltage vacuum circuit breakers, new energy, and electrical engineering.
For a long time, the company has maintained close technical exchanges and cooperation with domestic and foreign universities, scientific research institutes and electric power enterprises.
Hengfengyou independently designed and developed SCB series dry-type transformer and SC series oil immersed transformer. Our product performs with high operation efficiency, and obvious energy conservation. The overall performance index reaches the world's advanced level.
The company also maintains long-term strategic partnership with Schneider, ABB, Simens, Chint and other electric suppliers. We absorbed foreign advanced experience in electrical equipment production and independently designed and developed a series of substation equipment, which realized the automation and intelligence of the substation, and of which the performance has been highly recognized by the user at home and abroad. In the following five years, the company plans to build an intelligent workshop with an annual output of 100000 transformers.Then,the intelligent robot will replace 80% of the existing labor force, which will greatly improve the production efficiency, lower production cost, and produce more energy-saving, environmentally friendly, more safe and reliable the product for the users!
Under China's one belt, one road policy and as an outstanding one of China manufacturing enterprises of power transmission and distribution equipment, Hengfengyou has provided reliable electrical products and services for more than 50 countries and regions in the world. A good reputation of the brand name "HFY" was established in the global market, and won wide recognition and trust from customers.
In the new era, the company will adhere to the service concept of "global intelligent electric service provider, make life better", and adhere to the enterprise tenet of "integrity, innovation, customer achievement". We take "high quality products, wholehearted service" as the team spirit, and provide more excellent products and services for customers at home and abroad. Hengfengyou sincerely hope to establish with clients at home and abroad long-term win-win cooperation facing the future!
HFY Certificate
The Finished Power Project
Our Services
1.Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testing.
d. quick response within 12 hours any time.
3. After sale service
a.All parts are under Two Years Warranty with defects from manufacturer. All spare parts and component can be offered for free from the original manufacturer or HFY.
b. Training
We will provide free training to your technician free of charge at our factory site in Shanghai, China. The total training period would be 2 working days. All travel and related expensed would be at the purchaser's expense.
c. Technical Documents:
Original operation and service manuals, the service manual is completed with wiring diagram, block diagram and trouble shooting information.
d. Installation
Usually, clients can do the installation and operation by themselves when following the detailed English user manual. If clients want our technician do this work, please read the following terms:
The initial installation is not included with the professional HFY team member. All installation with the Hengfengyou team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While Hengfengyou team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for the Hengfengyou team required, the surcharge will be made in advance by the purchase at US$100/person/day plus all travel expenses. Travel expenses; local and destination transportation charges (air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily meals
Our Team and Exhibition
FAQ
Q1: Is OEM/ODM available?
A1: Yes, it is! Our products can be Customized. We have design and engineer teams,we can customize products according to customers' drawing or requirements.
Q2: What's your MOQ?
A2: One Set.
Q3: How is the delivery time?
A3: It depends your order quantity and it normally takes about 15-20 days.
Q4: How do you control the quality?
A4: We have QC team comply with TQM to ensure the quality. Each step is in compliance to the standards. At the same time, we will take photos and shoot video for you if you need.Every product will be fully assembled and carefully tested before packing and shipping.
Q5: How long is the warranty?
A5: Within one year from the sale date, if there are any accessory problems, you just provide the photos of damaged accessory, then we will provide free accessory. According to the number of products, we will provide easily damaged accessories for free. We also can provide technical support if you need.